Hobart CBD Residential Development, Tasmania, 2013 (Client: University of Tasmania). Martin was lead geotechnical engineer for an investigation for mulit-level student accommodation including double basement car parking in Hobart...
Berridale Hotel (MONA), Tasmania, 2013 (Client: Museum of New and Old Art). Martin was lead geotechnical engineer for an investigation for the proposed iconic hotel which has an extremely low level of redundancy being supported on a large central pier. Martin...
Railway Stability, Relbia, Tasmania (2010) Martin was originally involved in the assessment of the realignment of the rail line which was to connect with a section of track known as the ‘Cradle’ which was identified as a high risk active landslide. Zivko undertook...
Proposed Bridgewater Bridge, Hobart (2009 - 2010) This project was initially for the assessment of the existing causeway which forms 70% of the river crossing at Bridgewater. Subsequent to Zivko’s seismic hazard assessment and the geotechnical drilling, Martin...
East West Link, Melbourne (2012 - 2013) This project is the proposed underground road tunnel between Fitzroy and North Melbourne proposed by the Linking Melbourne Authority (LMA). Zivko undertook both surface wave seismic refraction and also downhole seismic...
Recent Comments